高潮刺激叫喊国产视频_清纯校花自慰喷白浆浪潮_美女一A级视频网站_甘雨触摸拔萝卜图片_国产亚洲观看无码等最新內容_中文字幕一区二区三区人妻少妇_欧美在线播放免费人成视频_亚洲不卡精品久久无码av_欧美 日本 亚欧在线观看_熟女如虎的丰满熟妇啪啪

一家大型連接器配套生產商,主營:電子產品所用到的各種端子線束,各種AC/DC插頭線等

為您提供各行業(yè)內連接線技術方案

專注連接器產品一站式服務商

咨詢熱線:

189-2588-3198 159-9279-1343

東莞市萬事通電子科技有限公司

Discuss the production of the network cable

* 來源: 萬事通電子 * 作者: admin * 發(fā)表時間: 2024/04/10 9:21:36 * 瀏覽: 14
Making of network cable
1. Use the trimming blade of the crimping pliers to cut the appropriate length of the network cable.
2. Use the cutting edge of the crimping pliers to cut the end of the thread neatly, and then put the end of the thread into the stripping knife, let the end of the thread touch the baffle, slightly hold the crimping pliers and rotate slowly, and use the knife to cut the protective rubber of the twisted pair. , Pull off the rubber.
3. Each pair of wires are entangled with each other. When making a network cable, the 8 wires should be disassembled one by one, and then arranged neatly in accordance with the specified wire sequence.
4. Straighten and flatten the network cable as much as possible, arrange one end in the order of white, green, green, white orange, blue, white blue, orange, white brown, and brown from left to right, and use the crimping pin to hold the end of the thread. Cut evenly. If the leftover skin is too long, you can cut the too long thin wires short and keep about 14mm. This length is just enough to insert the thin wires into their respective wire slots, and the crystal plug can just press the sheath to prevent the cable from being removed. The crystal head came out.
5. Use the thumb and middle finger of your left hand to pinch the crystal head, make the side with the plastic shrapnel down, and the pin side facing away from you, and hold it with your index finger; pinch the rubber outside the twisted pair with your right hand, and slowly force 8 The wires are inserted along the 8 wire slots in the crystal head at the same time, all the way to the top of the wire slot.
6. After confirming that all the wires are in place and checking the wire sequence, push the crystal head into the crimping tool clamping slot, and then firmly hold the wire pliers to press all the pins protruding from the crystal head into the crystal head.
7. Make the other end of the network cable in the same way. Note that the line sequence at this time is white orange, orange,
咨詢

在線客服

服務時間:9:00-18:00

電話

聯(lián)系電話

159-9279-1343

微信

微信二維碼

微信二維碼

手機網站

手機網站

頂部

咨詢